Thomas St Noosaville - Culvert Reconstruction

Client: Noosa Shire Council

Timeline: April 2017 - August 2017

RELATED PROJECTS

Civil Construction

Civil & Street Lighting Works - Coles Benowa U Turn

Civil Construction

Olsen Avenue Water Main

Pipejacking / Civil Construction

Micro Tunnelling Bardsley Avenue, Greenslopes

Civil Construction

Homework Caltex Civil Works

Replacement and reinstatement of approximately 155m of existing storm water drainage system from Thomas Street to the Noosa River. The drainage system is comprised of 1500mm x 600mm box culverts which were adversely affected by saltwater corrosion and degradation. The scope of works includes:

  • Removal, replacement and reinstatement of 155m of 1500 x 600mm Reinforced Concrete Box Culverts (RCBC) with precast, dowelled base slabs, and the installation of four trafficable maintenance pits;
  • Infilling a section of the redundant drainage system with flowable concrete
  • Preparation and implementation of a Tree Protection Zone (TPZ) within the foreshore park;
  • Preparation and implementation of an Acid Sulphate Soils Management Plan; and
  • Preparation and implementation of a traffic management plan to minimise the impact to public parking and traffic, pedestrians and adjacent businesses.