Teneriffe Drainage Construction

Client: Brisbane City Council

Timeline: March 2019 - December 2019

RELATED PROJECTS

Civil Construction

Civil & Street Lighting Works - Coles Benowa U Turn

Civil Construction

Olsen Avenue Water Main

Pipejacking / Civil Construction

Micro Tunnelling Bardsley Avenue, Greenslopes

Civil Construction

Homework Caltex Civil Works

Remove and dispose existing asphalt, kerb, gully pits, footpath, manholes and pipes; construction of 108m of reinforced concrete stormwater pipeline, diameters ranging from 375mm to 900mm; construction of manholes and gullies; 70m microtunnelling and pipe jacking 900mm reinforced concrete jacking pipe; temporary and permanent stabilisation works including soil nails, flowable fill, face protection matting, strip & sub horizontal drains, shotcrete, retaining wall stabilisation; installation of footpaths, asphalt & kerbing; replacement of sewer reticulation main; removal of heritage listed rail tracks and trees.